BDRR Shops         
And......that's a wrap, folks. Few people realize how much work it is to lay rail. A small rolling gantry crane makes all the difference in the world, sliding each 1700 lbs of stick rail into place without major effort. Track 2 is complete, Track 3 alongside the building is a year or two off. NYS&W 142 (to the right) is coming along nicely with her 15 year inspection/overhaul, and the crates to the immediate right contain new tubing to be installed over the coming months.
Date: 11/23/2019 Location: Phillipsburg, NJ Views: 592 Collection Of:   Chris S
Author:  Chris S
BDRR Shops
Picture Categories: This picture is part of album:  Belvidere & Delaware River
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5225260