Instead of adding it to the train which is sitting on the main at left, they shoved this cut of loads into another siding. Then the power pulled through the crossover and coupled back up. I thought (hoped) they were going to run east toward Sun Prairie, but instead they resumed switching, disappearing into the sidings again. |