Paving season  Contributor's Pick!       
During the road work season, Prema Asphalt in Holtsville, east of Ronkonkoma on the Main Line, would get trainloads of stone for their paving operations. The trains usually ran on Sunday afternoon, symbolled RF 56. This one is passing Bellerose, moving over from track 4 to track 2 at Queens.
Date: 6/5/1988 Location: Bellerose, NY Views: 442 Collection Of:   Tom Beckett
Locomotives: LI 152(MP15AC) LI 157(MP15AC)    Author:  Tom Beckett
Paving season
Picture Categories: Station,Signal,Action This picture is part of album:  LIRR Bellerose
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4258802